|
ROSCOMMON TOWNSHIP LAND USE CERTIFICATE APPLICATION
DATE: _____________________________________ Permit Number ________________
Owner: ______________________________________________ Phone: _______________________
Owner Address: _________________________________________________________________________
Property Address: __________________________________Property # _____________________________
Sketch lot, include dimensions, sizes and location of proposed structure, distances between structures on all sides
from front, side and rear lot lines.
Setbacks are measured from lot line to the closest part of the building (roof line, deck, eaves, etc)
Basement area: __________________ Bathrooms _____ Bedrooms _____ Fireplace ____Heat__________
Cost: ________________________ Fee: _____________________________
I hereby certify that all use for which this application is made will conform with ordinances affecting this Township,
Roscommon County, State of MI.
I hereby authorize the Roscommon Township Land Use Officer permission to inspect the property as needed.
This is a Land-Use certificate only. Building permit must be obtained form the Houghton Lake Building Agency.
Owner should also check deed restrictions.
Signed: _____________________________________ Date Approved or denied ______________________
Mailing Address: ________________________________________________________________________
_________________________________________________ ____________________________________
Land Use Officer
PO Box 610, Houghton Lake, MI 48629
989-422-4116 fax: 989-422-6145
When a Land-Use Certificate is denied, Applicant will receive a letter within 10 days giving the reason of denial
|